This Blog covers the requirements for inspection and maintenance of Pot bearings during service period(as per IRC code)
Inspection Frequency :The bearings are required to be inspected at an interval of one year for the first five years and at an interval of two years thereafter. However the bearings shall also be examined carefully after unusual occurrences like heavy traffic, earthquakes, cyclones and battering from debris in high floods.
Elements of inspection:
1) Measurement of movement :During inspection at site, measurements are required to be taken and documented to compute its movement and rotation values. To ascertain maximum movement, measurement should be taken once during peak winter (early morning) and once during peak summer (afternoon) and corresponding atmospheric temperature should be recorded. The recorded value of movement shall be compared with the design values.
2)Measurement of dimensions : Overall dimensions of the bearings are required to be measured and compared with the actual dimensions to ascertain any excessive stress or strain on the bearing.
3)Evidence of locked in condition: If any movable or rotating part of a bearing is found to be in locked-in / jammed condition, necessary rectification measures shall be taken immediately.
4) Evidence of corrosion: If corrosion of any part of exterior exposed steel surface of the bearing is detected the following measures may be taken.
- Detect affected part - Wire brush the affected portion to clean of its rust. - Apply protective coating as per manufacturer’s specifications.
In addition, the root cause of defect should be searched and proper actions should be taken to avoid recurrence of the problem.
5)Condition of the adjacent bridge structure: The adjacent structure of the bearings are also required to be inspected for any damage and necessary actions to repair the same, should be taken immediately.
Results and Actions:
The results of every inspection has to be recorded in the inspection report and shall be classified in each case into the following types of action:
A)No action.
B)Further measurements / long-term monitoring or design analysis needed (e.g. considering extreme temperatures / exposures, variation of loads etc.). Actions to be outlined in a report.
C)Minor repair works e.g. cleaning, repainting etc.
D)Repair or replacement of entire bearings or parts of the bearings. Actions to be outlined in a report.
Note :In case of defects where the cause of necessary actions cannot be determined by the inspecting person or the responsible bridge engineer, the bearing manufacturer shall be consulted.
The inspection shall be preceded by careful cleaning of the bearings as well as its surrounding space e.g. deposit of salt, debris, dust or other foreign material. The surrounding area of the bearings shall always be kept clean and dry to avoid damage to the bearings.
Suitable easy access to the bearing shall be provided for inspection and maintenance. It is advisable to provide adequate maneuvering space all around the bearing. Provision shall be made for jacking up the superstructure so as to allow repair/ replacement of the bearings.